What registration and insurance do the crews carry?
Idaho contractor registration, which the state requires on most jobs of $2,000 or more together with general liability of at least $300,000. The crews working through us hold that registration plus liability and workers' compensation coverage. In ACHD right-of-way the contractor must also carry ACHD's $25,000 bond and $500,000 of liability insurance.
Does a new driveway need a permit?
The City of Meridian does not permit a driveway at grade, because the residential code exempts driveways and sidewalks. ACHD issues a permit for any part inside its right-of-way: the approach, the curb cut, the public sidewalk. An HOA may require its own approval as well.
What is the typical price of a driveway?
Roughly $8 to $12 a square foot, reinforced and air-entrained over compacted gravel. For a 24 by 40 ft two-car driveway that is about $7,700 to $11,500, with tear-out of the old slab adding $1.50 to $2.50 per square foot. An approach in ACHD right-of-way is a separate line item.
Is there a charge for the estimate?
No charge. The estimator measures, digs a test hole where soil matters, reviews the plat and the irrigation lines, and leaves a written price valid for 30 days.
When is a deposit due?
Only after you approve the written price and the job is on the schedule. Flatwork is paid when finished; foundation jobs may be paid in stages at the inspections.
My driveway dates from about 2005. Why is it scaling and cracking?
Driveways from the boom years were often thin, placed over little or no base, and not always air-entrained. About 92 freeze-thaw days a year and road deicer dripping from vehicles then flake the surface and shift the panels. Replacement adds the base, the reinforcement and the correct mix.
Can a sunken slab be raised instead of replaced?
Yes, when the concrete is intact. Polyurethane foam lifts a settled garage apron, walk or stoop in one morning, and the slab takes traffic the same day. A slab broken into pieces or scaled down to the aggregate is better replaced.
What is the cemented layer a shovel hits in Meridian?
Duripan: hardpan cemented with silica. The soil survey places it near 24 inches in Purdam soil, Meridian's most common, and near 31 inches in Elijah soil. It mainly affects footings, which are dug to the 24-inch frost line.
Is RV parking allowed on my driveway?
In the street yard Meridian permits one RV or trailer with current registration, under 16,000 pounds, provided it does not overhang the sidewalk, and that yard must be paved. HOA rules can be tighter.
Which ice melt will not damage concrete?
In the first winter, none; spread sand. From the second winter, a light application of plain rock salt on a sealed slab. Magnesium chloride and ammonium-based products should never be used.
Who repairs the sidewalk along my street?
ACHD handles most public sidewalks. Owners are responsible for carriage walks, driveway approaches, decorative concrete in the right-of-way, and damage caused by their own trees. ACHD's code classifies a ¾-inch offset as a hazard.
What happens to the removed concrete?
It goes to a recycler for crushing into base material wherever one accepts it, which usually costs less than landfill disposal.
How long before new concrete can be used?
Foot traffic after one day, cars after about seven days, trucks and RVs after two to four weeks. Foam-lifted slabs can be used the same day.
Do you work outside Meridian?
Yes: Boise, Nampa, Eagle, Kuna, Star, Caldwell, Garden City, Middleton and every part of Meridian. Permit rules differ by city, and ACHD has no authority outside Ada County, so we confirm which approvals apply to your address.
Does anyone pick up after hours?
Yes. Calls are answered around the clock, seven days a week, and an estimator phones back the next business morning.
